Mentra · Career summary
Nadia
Planning Engineer
Construction · MENA · Saudi Arabia · Mid-level · Full-time · On-site
Current role
Planning Engineer · Mid-level
Target role
Planning Engineer · Mid-level
Main career goal
Better opportunity
When do you intend to start applying?
Within 1 month
Resume health
Score withheld
Too little of the resume could be assessed to show an overall number. The findings below are the ones with evidence.
Source: Resume text read.
01 · Use consistent dates for each role.
From the CV: Planning Engineer | Example Construction Ltd | January 2021 – Present
Suggested line: [Month Year] – [Month Year or Present]
02 · Show the scope of the work: project, audience, or a verified measure.
From the CV: Prepared weekly progress reports.
Suggested line: Add the project scope or a measure you can verify. Do not invent a number.
Skill evidence
No O*NET snapshot or licensed job advertisements are connected. These are skills found in the resume, not market demand.
Primavera P6
Keep this line. It already shows Primavera P6.
From the CV: Developed and updated project schedules in Primavera P6.
Do these next
Use consistent dates for each role.
From the CV: Planning Engineer | Example Construction Ltd | January 2021 – Present
You are Mid-level as Planning Engineer, and the target is Mid-level Planning Engineer. Add the size of one project so the CV supports that step.
From the CV: Planning Engineer
You said you will apply Within 1 month. Edit the line above before you send the CV.
- Reading order and file layout were not assessed.
Reference sample